Most all of the factory brochures I've ever seen claim the ride (pick any ride) can be set up by two men in two hours ;-)

I think the Evolution you are thinking of (the big one in Europe) takes longer than one day to set-up, although a Fabbri Evolution can probably be set-up in a single day by an experienced and well-managed crew. The brochure for that ride might claim two men, three hours.
Who is Number One?
The KMG Speed looks like it would be child's play to take down... It looks like they just have to park it horizantaly, and then retract the hydrolics on the 2 arms, and they retract the main boom.
ya, there's almost nothing to the turbo force rides, cause KMG thought of a way to make it setup and tear down in 30 minutes.

basically just takes 3 sets of hydrulics. 1 set for each arm and 1 to raise and lower
ride design is my specialty
There's not very much to these Turbo Force-type rides.

Quote:

quote:


Originally posted by IMPERIATOR

booster a couple of hours!! thats amazing for a big ride like that,

very quick 1 da for evolution is that 24 hours or dawn till dusk
either way evolution is a huge ride to build its cool that it can bve done so quick.

booster a couple of hours!! thats amazing for a big ride like that,

very quick 1 da for evolution is that 24 hours or dawn till dusk
either way evolution is a huge ride to build its cool that it can bve done so quick.
Jay
Spin out is like

3-4 hour setup time

2 1/2 - 3 hour tear down time

thats about what i remember ours being when we had it...
i will ask near the end
i belive bosster is about two hours with a good crew 1day
mega drop 2 to3 hours but bishup like makes it into halfs actual 2 days
spinout 1 day
evalution 1 day
[:D][:D][:D][:D][:D]
i tryied

any one can help me i know some but i cant find them until the end of the fair.
hi

can anyone tell me how long it takes to set up these rides

booster
evolution
mega drop
top spin
spin out

thanks
Jay